Fix the task and limits of the first version
Start with a brief description of the business, audience and main action on the site. Next, determine what is included in the first launch, and what can be added later. “Modern website that sells” does not give the team a verified result.
Clarify who is coordinating the work, how the comments are collected and what is considered a change in volume. If a new feature appears after the scenario is approved, it should be evaluated separately according to terms and budget. This helps to manage the project, not argue at the end.
Describe pages through content and action
For each type of page, write down its purpose, blocks, source of materials and possible actions. The service template can be one, and filled pages – several. This difference is important to indicate in the estimate.
| Part of the task | What to write | Example of verification |
|---|---|---|
| Structure | Sections and page types | Give every service a clear place in the site structure |
| Content | Who prepares texts, photos, translations | No indefinite stubs before launch |
| Functions | Scenarios and states | Form correctly handles success and error |
| Integrations | System, data, exchange rules | The enquiry contains the agreed fields |
| Editing | What the owner can update independently | The price changes without changing the code |
| Acceptance checks | Set of checks | The team and the owner repeat one test |
The description of the structure can be started with the Service Site Map. You do not need to duplicate a large document if one table clearly records the result.
Example: Requirements for the enquiry form
Below is a training example that you need to adapt to the real process of the company. It does not mean that each site needs all these fields.
- The visitor specifies the name and one way to contact; comment is optional.
- Mandatory fields are checked before sending and clear hints are shown.
- During the query, the button shows the state of waiting, re-pressing does not create a take.
- Success is displayed after confirmation of acceptance by the server.
- If the service is not available, an error message and the ability to repeat the attempt are displayed.
- The manager receives the enquiry fields and the page source in the agreed system.
- Analytics records a successful enquiry once without personal data in the parameters.
Add where the enquiry arrives, who has access and what happens when integration fails. Do not leave the recipient’s address as a temporary developer value before launching.
A verifiable requirement
- Conversation flowWhat the visitor does
- ResultWhat people and businesses should get
- ErrorWhat happens if something fails
- Acceptance checksHow the team confirms readiness
Integrations and technical conditions
For CRM, payment, delivery or external directory, determine the direction of exchange, a set of fields and the responsible for access. Specify the behavior when re-requesting, error and unavailability of the service. The wording “connect CRM” without these details does not describe the completed work.
Separately agree on languages, editor roles, import of old materials, URL storage and event accounting. If there is a valid site, you need a list of important pages and a plan for moving. If there are paid licenses, you need to know who owns them and continues to pay.
Design and adaptation without fuzzy requirements
Instead of asking for “beautiful and expensive”, provide examples and explain what matters: readable tables, subtle animation, distinctive typography or clear navigation. Agree on key templates and states, including mobile layouts, form errors and long headings.
Speed also requires verification conditions: which pages, devices and user flows are tested. The promise of the same score in each launch PageSpeed without specifying the environment is not suitable as a universal acceptance criterion. It is better to combine measurements with the real performance of scenarios.
How to take a ready site
For each requirement, write a simple test. If the owner has to change the price, let him do it in the test material. If you need to transfer an order to CRM, check not only the message on the screen, but also the entry in the system. The results are fixed with the date and status.
Before handover, agree on access, instructions, backups and support. Requirements for WordPress Backup especially important before updating the current site.
Do I need a large TS for a small site? The document can be short. The key is clear functions, materials and readiness criteria.
Who writes TS? The owner describes the business and rules of work, the team specifies the scenarios and technical implementation. The final version is agreed by both parties.
What to do with new ideas? Write a separate list, evaluate the impact and decide whether they are in the current stage. Yes cost of site depends on the actual scope of work.
Editorial Cartel Digital. Practical advice and examples, prepared on 17–18 October 2026. Illustrative scenarios do not represent client project results.
Find out about Website creation, cost of work Or describe us the task.


